Not Just a Requirement: The Value of Torque Logs In Data Center Construction

At a time when speed to market is being measured as the ultimate goal in data center construction, many vital factors in the process are often overlooked. One of those is the proper recording and reporting of torque logs.

However, torque logs can no longer be perceived as just “subcontractor paperwork.” These logs have become a leading indicator of data center reliability and operation, to the extent that operators are now specifying torque logging in their construction standards.

It is now crucial that all parties involved in data center construction, especially general contractors, prioritize this key step.

Beyond a Checklist Item

Torque logs are critical QA/QC tools that protect the general contractor’s reputation, reduce liability, and ensure the data center will meet the owner’s uptime and safety expectations. There are several reasons why torque logs should be a focus in data center construction:

1. Quality Control & Documentation

General contractors are ultimately responsible for ensuring that installations conform to engineering specifications and quality standards. Torque logs provide a documented trail proving that every critical bolt or connector was tightened to the correct specification—vital for commissioning and client handover.

2. Risk Mitigation & Liability Protection

In a facility where reliability is king and downtime is extraordinarily costly, general contractors benefit from torque logs as tangible proof that installation procedures were rigorously followed. This documentation becomes crucial in defending against post-construction claims or failures.

3. Subcontractor Oversight

Multiple subcontractors (electrical, mechanical, structural) may be responsible for torque-critical tasks. Torque logs enable general contractors to audit, verify, and sign off on each package of work in an organized manner, ensuring consistency and accountability.

4. Commissioning & Turnover Efficiency

During final commissioning, owners or commissioning agents will ask for traceable documentation. Torque logs are often part of the turnover deliverables, helping general contractors avoid delays during reviews or rework requests.

5. Safety Assurance

Loose or improperly torqued connections in critical systems (electrical busbars, grounding systems, mechanical flanges) can lead to overheating, mechanical failure, or even catastrophic incidents. Torque logs demonstrate proper fastening, reinforcing the safety integrity of the installation.

6. Corrective Action & Prevention

Torque logs aren’t just records—they can highlight anomalies such as trends of wrong torque values or tool miscalibrations. General contractors can use this data to mandate tool recalibration, retraining, or process tweaks before minor issues compound into major problems.

An Outdated Paper Process

As data center projects continue to expand without a hint of slowing down, the industry cannot keep up with demand. This imbalance has highlighted many opportunities to streamline delivery, though. One such opportunity is improving the torque logging and reporting practice that hasn’t changed since torque tools were first invented.

Traditional QA/QC processes rely on people, paper, and poor visibility, requiring extensive manual effort. This approach is error-prone, time-consuming, and inconsistent across contractors, leading to rework, delays, and audit failures. Fortunately, there is now a better way to capture this information and accelerate construction with quality assurance.

The Digital Way to Document Torque

Construction technology like the Cumulus Quality Execution System addresses the challenges of a paper process by automating data capture and standardizing digital reporting across all contractors. This software replaces cumbersome manual processes with a seamless, digital workflow that saves thousands of man hours, reduces rework and eliminates the need for paper torque logs.

As data center construction continues to accelerate, the need for reliable, safe, and compliant infrastructure (which includes torque activities), has never been more critical. Cumulus revolutionizes the creation of torque reports, automating data capture, standardizing processes, and delivering real-time quality assurance.

Conclusion

Torque logs are critical quality and reliability tools that are becoming an industry expectation and a differentiator for general contractors. Digital solutions like Cumulus, modernize torque documentation, ensuring compliance, safety, and efficiency while protecting reputations and reducing risk.  Cumulus provides digital torque guidance and automated QA/QC documentation, streamlining data center construction and delivering unmatched efficiency and quality.

Facebook
Twitter
LinkedIn

Jon

Jon Chesser is a seasoned executive with over two decades of experience in the data center and energy sector, developing and implementing technology that adds value to the bottom line. Jon has been part of building multiple construction tech startups focused on digitalizing manual, paper-based processes. Jon is the Chief Growth Officer for Cumulus and is passionate about improving construction productivity. Jon lives in Denver with his family and enjoys snow skiing, mountain biking, and hiking 14teeners.