Electrical infrastructure lies at the heart of
data center facilities

Even minor errors in cable installations or electrical terminations can lead to costly rework, safety hazards, or startup delays.

For developers, integrators, and electrical contractors building data centers for pre-leased hyperscale clients, standardizing and automating the documentation of Cable Test Reports and Electrical Torque Reports is no longer optional, it’s essential.

why Cable Test and Torque Reports Matter

Ensure Reliability

Faulty cables or loose connections can cause outages, jeopardizing the 99.999% uptime hyperscalers promise.

Enhance Safety

Improper installations risk arc flashes, fires, or injuries, endangering workers and infrastructure.

Prove Compliance

Auditable documentation is required for industry standards (e.g., NEC, IEEE) and certifications like Uptime Institute Tier ratings.

Support Maintenance

Reports provide a baseline for future troubleshooting, critical for long-term operations.

Cumulus Replaces Cumbersome Manual Processes with a Seamless, Digital Workflow


On an average 50 MW data center building, contractors typically complete over 3,000 manual forms for cable testing and torque verification, each requiring at least one hour of combined effort from general foremen and QA/QC teams. Cumulus eliminates this burden, saving over 3,000 cumulative man-hours (approximately $300,000) per building by automating data capture and report generation.

Hear What Our Customers Have to Say:

benefits

Eliminate Manual Data Entry

Our mobile app and Bluetooth-enabled tools capture real-time data, replacing paper-based Cable Test and Torque Reports with automated, cloud-based records.

Reduce Rework

By guiding workers through digitized SOPs and verifying compliance in real time, we prevent errors that lead to costly rework, which can account for up to 12% of project costs. 

Real-Time QAQC Visibility

Contractors gain a single dashboard view of work progress and quality, enabling proactive issue resolution and serving as a proxy for project completion milestones.

Audit-Ready Documentation

We ensure standardized, traceable reports that meet hyperscaler and regulatory requirements, streamlining commissioning and handover.

Cumulus In Action

Learn how Excellerate integrated Cumulus to address challenges in its quality control processes for the assembly of modular electrical buildings for data centers.

New Integration Alert: Cumulus now connects with Megger! Simplify your insulation resistance testing like never before.

X

Jon

Jon Chesser is a seasoned executive with over two decades of experience in the data center and energy sector, developing and implementing technology that adds value to the bottom line. Jon has been part of building multiple construction tech startups focused on digitalizing manual, paper-based processes. Jon is the Chief Growth Officer for Cumulus and is passionate about improving construction productivity. Jon lives in Denver with his family and enjoys snow skiing, mountain biking, and hiking 14teeners.