Shell and Bechtel Partner with Cumulus To Enable Project Digitalization

Pennchem 3 1

Deploying Cumulus technology to enable project digitalization yielded strong results for PennChem. Decreasing leaks and the use of manual paperwork represented a major win for project productivity.

The Challenge

At refineries and chemical plants, flange leaks are a major problem. These leaks are one of the most common repair items and can cost over $3 million USD each year. These leaks release more than 170 million metric tons of greenhouse gas emissions annually, equivalent to the emissions of one fifth of all cars in the United States.

Further, the amount of rework required to correct poor work quality and missing paperwork in flange management is substantial. For that reason, manual paperwork can be a large hindrance in overcoming the challenge of flange leaks.

  • Flange leaks
  • Emissions
  • Manual paperwork

The Solution

To overcome this challenge, Shell and Bechtel partnered with Cumulus to develop and implement a solution for Shell’s Pennsylvania Chemicals project (PennChem). Digitalization and scalability were key criteria for implementing an effective, long-lasting solution.

A digital flange management system was deployed at scale, yielding clear benefits for the PennChem project. The deployment included manual tightening, hydraulic tightening, and hydraulic tensioning activities.

Project engineering controls were enforced using the following metrics:

  1. Building a data model for each joint with the appropriate information

  2. Enforcing the proper engineering and quality controls for each joint

  3. Capturing data during workflow activities

  4. Flagging exceptions encountered during each activity

  5. Flagging changes to technical data that impacted work previously completed in the field

  6. Building a digital completion report for each activity

  7. Recording the complete history of work activities

The Results

Leak and Rework Prevention

With Cumulus, leak rates are reduced to approximately 0.1%, a 100X reduction compared to traditional methods.

Digital Twin Developed

Over 120,000 bolted joint assemblies were managed on PennChem’s project, with all data stored digitally.Owner-side review meetings shrank because the data was already available.

Hours Saved On Paperwork

Digital records and processes were implemented, replacing paperwork with a streamlined, organized system.

Share:

Schedule a demo to see Cumulus in action

Build custom digital workflows to guide field workers

Automate work completion and quality reporting

Integrate with powerful tools and technologies to get real-time work visibility