The Value of Modular Fabrication for Data Center Construction

image of data center module

Cumulus Team

March 13, 2025

The data center industry is experiencing unprecedented growth fueled by the insatiable demand for cloud computing, artificial intelligence, and other data-intensive applications. Data center owners and developers seek faster, more efficient, and scalable construction methods to meet this demand. Modular fabrication for data center construction has emerged as a transformative solution, enabling the off-site construction of pre-engineered, prefabricated data center modules that are then transported and assembled on-site. The fast-growing adoption of modular fabrication in data center construction highlights the critical importance of adherence to best practices to ensure proper bolted connections and to mitigate risks.

The Accelerating Trend of Modular Data Centers

Traditional data center construction is a complex, time-consuming, and resource-intensive process. As demand for data storage and processing capacity accelerates, traditional, on-site construction methods struggle to keep pace. Modular fabrication offers a compelling alternative, shifting a significant portion of the construction process to a controlled factory environment. This approach provides several key advantages:

  • Speed and Efficiency: Modular construction can significantly reduce project timelines. While site preparation occurs concurrently, modules are fabricated, assembled, and tested off-site, resulting in faster deployment.
  • Cost Control: Factory-controlled production can save costs through efficient material procurement, reduced labor costs, and minimized on-site construction time.
  • Improved Quality and Consistency: Off-site fabrication in a controlled environment enhances quality control, ensuring consistent manufacturing processes and minimizing variations.
  • Enhanced Safety: Factory-based construction reduces on-site risks associated with weather, site congestion, and complex coordination.
Best Practices for Ensuring High-Quality Modular Fabrication

A rigorous quality control process is essential to maximize the benefits of modular fabrication. Best practices include:

  • Detailed Design and Engineering: Comprehensive planning and detailed engineering are critical for successful modular construction. Precise specifications, 3D modeling, and building information modeling (BIM) are essential tools.
  • Factory Acceptance Testing (FAT): Before modules leave the factory, a thorough FAT process should be conducted to verify functionality, performance, and compliance with specifications.
  • Integrated Systems Testing (IST): After module assembly on-site, IST ensures that all interconnected systems function correctly as a unified whole.
  • Quality Control Inspections: Regular inspections throughout the fabrication process, including visual inspections, dimensional checks, torque verification, and non-destructive testing, are essential to identify and address potential issues.
  • Documentation and Traceability: Maintaining detailed documentation of all materials, components, and torque provides traceability and accountability throughout the supply chain.
  • Collaboration and Communication: Effective communication between the data center owner, general contractor, modular fabricator, and other stakeholders is vital for project success.
The Critical Importance of Proper Bolted Connection Torque and Accurate Torque Logs

Module Fabricators, often called “Integrators,” must ensure that all bolted electrical, mechanical, and structural connections are torqued to the manufacturer’s specifications using calibrated torque wrenches, and document the results in a detailed torque log. Hyperscale data center owners are increasingly incorporating detailed torque logs requirements into their contracts and specifications. This trend is driven by the hyperscalers’ extreme sensitivity to downtime, their focus on maximizing reliability, and the need to adhere to the industry’s best practices.

The following are some best practices for ensuring a proper torque procedure:

  • Use Calibrated Torque Wrenches: Always use calibrated torque wrenches to apply the correct torque specified by the equipment manufacturer.
  • Follow Manufacturer’s Torque Specifications: Adhere to the torque values and sequences specified in the manufacturer’s installation and maintenance manuals.
  • Documentation of Torque Values Using Torque Logs: Record the applied torque values for each connection for future reference and maintenance. Maintaining detailed torque logs is essential for accountability, verification, traceability, trend analysis, and quality control.
  • Leveraging Digital Torque Logs & Automated Data Collection: Digital torque logs offer advantages over traditional paper logs, including improved accuracy, efficiency, data integrity, and integration with third-party systems.
Digital Torque Logs & Automated Data Collection

Many module fabricators face industry challenges such as time-consuming quality control processes, production bottlenecks, inaccurate paper documentation, and costly on-site rework, often stemming from inconsistent bolted connection torque.

Leading module fabricators now use digital torque logs and an automated data capture strategy to enhance quality and efficiency. The benefits of using this type of strategy include:

  • Standardized Work Instructions: Technicians are provided with clear, step-by-step digital instructions for each task, including proper torquing procedures and values.
  • Automated Data Capture and Documentation: Automatically records torque values and creates a comprehensive digital record, eliminating manual data entry and the risk of lost or inaccurate paperwork. This also reduces the risk of “pencil whipping.”
  • Improved productivity: Modules are produced faster due to reduced waiting times for QC personnel or equipment.
  • Increased process controls: Ensures that all connections are accurately torqued and logged, reducing the chance for human error and enforcing adherence to procedures.
  • Rework Avoidance: Significantly reduces costly on-site rework by preventing out-of-calibration tools and ensuring proper torque application during fabrication.

A proactive approach to quality control, including advanced torque management systems, is essential for modular data center fabrication success.

Conclusion

Modular fabrication is revolutionizing data center construction, offering significant speed, scalability, cost, and quality advantages. By adopting best practices for quality control, including leveraging digital torque verification and automated documentation systems like the solutions provided by Cumulus, data center owners and developers can experience the benefits of modular construction while mitigating the risk of rework. Ultimately this process ensures the safety and reliability of critical infrastructure and achieves significant operational efficiencies.

Cumulus provides a unique torque quality verification and validation method that uses software (connected with IoT devices) to automatically create QC documentation, integrating production and quality into a digital and real-time workflow. Hyperscalers and developers request their contractors use Cumulus to save time, reduce costs, avoid construction schedule delays, and eliminate rework.

As the demand for data center capacity continues to grow, modular fabrication will play an increasingly vital role in shaping the future of the data center industry.

Share:

Schedule a demo to see Cumulus in action

Build custom digital workflows to guide field workers

Automate work completion and quality reporting

Integrate with powerful tools and technologies to get real-time work visibility